Press Box
Posted
Please Click On The Images Below For Larger Versions
Day One – The Starting Point
Front Of The Press Box
Rear Of The Press Box
Press Box Entrance
Press Box Interior
Press Box Video Area
Day Two – Demo On Three Walls And Re-sizing Window Openings
Old Materials Removed From Front Three Walls
Drop Ceiling Removed
Finished Reshaping Window Openings
Hanging Plywood For Exterior Walls
Plywood Hung
Interior With Front Wall Hung
Day Three – Re-enforce Roof And Wrap The Exterior
Steel Up On The Joists
Exterior Wrapped
Day Four – Install The New Windows
New Windows Set In Place
Exterior View
Day Five – Strip The Rear, Insulate, And Start The Cap
Rear Replaced With New Material
Insulation Installed
Building Cap Wrapping Around To The Right
Day Six – Drywall, Start Adding Metal, And Install The Door
Drywall Hung
Metal Hung On The Rear And The Building Cap
Door Installed
Building Cap Frame Finished And Wrapped On Three Sides
Day Seven – Finished Metal And Prime The Interior
Finished Metal Front
Door Side
Rear
Far Side
Priming The Paint On The Desk And Walls
Day Eight – Ceiling Install
Drop Ceiling Hung
Day Nine – Lighting And Flooring
Flood Light Installed Near Door
Parking Lot Flood Hung On Rear
Can Lights Installed In Ceiling And Floating Floor Laid
Finished Front
Finished Interior
Finished Rear